Skip to main content
Sikes Design

Projects

Gray concrete building under blue sky
01 / Case Study

Bellevue Residence

Bellevue, WA — 2009

Rather than a full re-clad, developed a performance-based repair scope: removed and rebuilt brick veneer with proper weep holes and a diverter, replaced stucco and waterproofing only at the deck-damaged zones with a new elastomeric coating system, replaced deck membranes with corrected drainage and parapet details, and retrofitted window/door sill pans and head-flashing end dams -- with sill-track testing, construction observation, and ongoing annual inspections recommended.

  • WA
  • Retrofit
  • Window-to-Wall
Building under construction
02 / Case Study

Schafer Residence

Sacramento, CA

  • Retrofit
  • Fire Damage